DENMEAD, FIRST FLOOR DORMER INSTALLATION, SITE VISIT PICTURES

Pictures taken during our recent site visit to a large dormer installation to existing first-floor accommodation over a stable block.

Working with the structural engineer’s JB Architecture was able to design a lightweight structure that could be constructed off of the existing structure in order to gain as much habitable space within the attic.

Once complete this dormer will allow for uninterrupted views over the surrounding stunning landscape.

JB Architecture was appointed in order to gain the building regulation approval for this project.

Working alongside the client’s brief and budget this project is really starting to take shape.

Project Contractor: Groundforce Developments